Research on methodology to assess geological and technical measures for oil field depletion
Abstract
To maintain and increase production output, priority has been given to apply geological and technical measures such as drilling new production wells (infill wells, sidetrack wells), water shutoff, interval perforation change, hydraulic fracturing, near wellbore hydrochloric acid treatment, upstream/downstream transitions - recumbent horizons, perforation, initiation and shooting. During the 2015 - 2018 period, in the main fields of Cuu Long basin, the number of wells having GTM conducted was comparatively large, accounting for about 10% - 15% of the production wells. In this paper, the authors established standard evaluation procedure for infill/sidetrack well plans, and conducted trial application of the procedure to appraise new well drilling plan in Bach Ho field.
References
Nguyễn Hữu Trung. Công nghệ mỏ dầu khí ứng dụng. 2018.
Liên doanh Việt - Nga “Vietsovpetro”. Báo cáo cập nhật trữ lượng dầu và khí hòa tan mỏ Bạch Hổ đến thời điểm 1/1/2017.
Liên doanh Việt - Nga “Vietsovpetro”. Báo cáo Sơ đồ công nghệ hiệu chỉnh khai thác và xây dựng mỏ Bạch Hổ. 2013.
1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.